Facilities

Photo of Greenfield Public Schools maintenance workers

Alan Schmidt, Director of Facilities:  413-772-1300 

Name School Position
Charles Adams Federal Street Day Custodian
Dennis Phillips Four Corners/Middle School Night Custodian
Eugene Warren High School Day Custodian
Jim Van Valkenburgh Middle School Night Custodian
Joel Bryant Middle School Day Custodian
John Ames High School Night Custodian
Keith Urkiel Academy of Early Learning Day Custodian
Kenneth Sigsworth High School Night Custodian
Larry Fairbrother Federal Street Night Custodian
Peter Tuttle Middle School Night Custodian
Richard Hawkins MSA Floater, Night Custodian
Stephen Fleury C.A. Maintenance
Steve Fairbrother C.A. Maintenance
Terry Fisher High School Night Custodian
William Cardaropoli Four Corners Day Custodian
William McDonough Newton Day Custodian
Brandon Kelley Newton Night Custodian, Floater

 

Greenfield School District Projects  11/14/2015                                                                         

High School:

·         New High School-Temp. Cafeteria

·         NEASC Report for Facilities

·         Removal of underground oil tank

Middle School:

·         Addressed deficiencies noted in 2013 & 2014 Fire Alarm & Test Reports

·         Repaired leak from heating system in library

·         Aces move from Green River

·         Security Camera System installation

·         Fourth Grade move to other schools

·         Replaced parking lot entrance door

·         Sidewalk replaced, and pitched. to keep water away from entrance door

·         New window treatments for Cafeteria

·         Front entrance, granite stairs repaired

Four Corners:

·         Replaced cracked and damaged bathroom fixtures

·         Addressed deficiencies noted in 2013 & 2014 Fire Alarm & test Report

·         Heating system repairs

·         New A/C system and window treatments to comply with ADA requirements in Mushrooms

·         Addressed ADA compliance issues from state audit

·         Security Camera System installation

·         Removed old caulk and resealed skylights in Gym to stop leaks

Federal St.:

·         Repaired coupling to prevent leak from roof drain in basement

·         Addressed deficiencies noted in 2013 Fire Alarm & test Report

·         Heating system repairs

·         Security Camera System installation

·         New LED Gym lighting

·         Renovate Storage Room to create new Music Room

·         Addressed need for hazardous waste disposal in basement Storage Room with Fire Dept. and DPW

Green River:

·         New Roof

·         New insulation and air sealing in attic

·         Asbestos Abatement of classroom and hallways

·         Installation of new VCT flooring in classroom 23 and hallways

·         Heating system repairs

·         Security Camera System installation

·         New entrance created in school

·         Exterior doors replacement

·         New windows installation

·         Modifications to doors, plumbing fixtures and doors to comply with ADA requirements

·         Eagle Scout Project- Outdoor Classroom

·         Installation of Access Control Swipe Card System

·         New LED Gym lighting

·         Refinished and relined Gym floor

·         Removal of underground oil tank

Newton:

·         Addressed deficiencies noted in 2014 Fire Alarm & test Report

·         New Roof

·         Security Camera System installation

·         Modular classrooms replacement

·         New insulation in attic

·         Repaired damage to ceilings and walls due to water damage from ice dams and leaks

·         New flooring installed in administration offices due to water damage

·         Refinished wood floors in 100 year old classrooms

·         New window treatments for Music Room

N. Parish:

·         Replaced leaking OS&Y valve on fire sprinkler system

·         Addressed deficiencies noted in 2013 & 2014 Fire Alarm & test Report

·         Replaced counter top in kitchen to address Board of Health violation

·         Tint windows to address safety concerns

·         Roof replaced

·         Security Camera System installation

·         Addressed ADA compliance issues

·         Replaced bathroom fixtures

·         Replaced broken Gym and Library doors

·         New parking lot

·         New fence

Central Administration:

·         Split system installed to replace oil fired boiler

 

Greenfield School District Projects  2/1/2016         

High School:

·         New Storage Shed

·         Completed Integrated Pest Management Plan for school

·         NEASC, Report for Facilities

Middle School:

·         Access Control, Swipe Card System installation

·         Breakfast in the Classroom

·         Installed Snow Guards on shed roof behind the school

·         Completed Integrated Pest Management Plan for school

·         Addressing deficiencies noted in 2015 Fire Alarm & Test Reports

Four Corners:

·         Modify Server Room for IT Dept. Installation of A/C units and replace walls

·         Completed Integrated Pest Management Plan for school

·         Composting Program to recycle Cafeteria waste with Franklin County Waste Mgt.

Federal St.:

·         Repaired coupling to prevent leak from roof drain in basement

·         Asbestos Abatement for new Music Room

·         Refinished wood flooring and installed cove base in new Music Room

·         Replaced backflow preventer to fire sprinkler system

·         New fence installed along the back of the playground

·         Replaced elevator switches, Federal St. North

·         Completed Integrated Pest Management Plan for school

Green River:

·         Breakfast in the Classroom

·         Asbestos Abatement, Room 7

·         New VCT, Vinyl Composite Tile flooring and cove base, Room 7

·         Completed Integrated Pest Management Plan for school

Newton:

·         Addressed deficiencies noted in Fire Alarm Test. Horns and Strobes synchronized

·         Breakfast in the Classroom

·         Completed Integrated Pest Management Plan for school

·         Modified Custodial Closet for new server rack for wireless project

·         Replace Attic Insulation

 

N. Parish:

·         Replaced backflow preventer to boiler

·         Relocated and replaced motion sensors for security system

·         Completed Integrated Pest Management Plan for school

Central Administration:

·         Integrated Pest Management Audit and Inspection Report complete

·         Removal of oil tank and waste oil

Greenfield School District Projects  12/28/2015  

High School:

·        Sampling and testing for lead and copper completed. Lead & Copper in Schools Maintenance Checklist completed and submitted to MA Department of Environmental protection.

·        Composting program implemented in conjunction with Franklin County Solid Waste Management District

·        MSBA Survey completed and submitted to the state

Middle School:

·        Sampling and testing for lead and copper completed. Lead & Copper in Schools Maintenance Checklist completed and submitted to MA Department of Environmental protection.

·        Installed new carpet in Main Office and offices

·        MSBA Survey completed and submitted to the state

Four Corners:

·        Sampling and testing for lead and copper completed. Lead & Copper in Schools Maintenance Checklist completed and submitted to MA Department of Environmental protection.

·        Composting program implemented in conjunction with Franklin County Solid Waste Management District 

·        Security tint windows of Administration Offices

·        MSBA Survey completed and submitted to the state

Federal St.:

·         Sampling and testing for lead and copper completed. Lead & Copper in Schools Maintenance Checklist completed and submitted to MA Department of Environmental protection.

·         New Boilers installed in Federal St. South

·         Demolition of old boilers and asbestos abatement in Federal St. North

·         Roof replaced on link between Federal St. North and South

·         New insulation and air sealing in attic

·        Composting program implemented in conjunction with Franklin County Solid Waste Management District

·        MSBA Survey completed and submitted to the state

Green River:

·        Sampling and testing for lead and copper completed. Lead & Copper in Schools Maintenance Checklist completed and submitted to MA Department of Environmental protection.

·        New smoke detection system for the Gym connected to Fire Alarm System

·        Composting program implemented in conjunction with Franklin County Solid Waste Management District

·        Installed acoustic tiles in Room 24

·        MSBA Survey completed and submitted to the state

Newton:

·        Sampling and testing for lead and copper completed. Lead & Copper in Schools Maintenance Checklist completed and submitted to MA Department of Environmental protection.

·        Erosion control and drainage lines installed around modular classrooms

·        Powered ventilation installed in roof

·        Composting program implemented in conjunction with Franklin County Solid Waste Management District

·        MSBA Survey completed and submitted to the state

N. Parish:

·        Sampling and testing for lead and copper completed. Lead & Copper in Schools Maintenance Checklist completed and submitted to MA Department of Environmental protection.

·        Refinished and relined Gym floor

·        MSBA Survey completed and submitted to the state

Central Administration:

·        Completed renovations and move from Davis St. to new offices in the Middle School

·        Install access controls on Middle School and Central Administration doors

·        Install Security Camera and Alarm systems

·        Install antenna and communication equipment for Transportation Coordinator

·        Moved Maintenance Dept. equipment and supplies from Davis St. to the Middle School